Engineered Excellence Delivered
HOME  >>  TRAINING & TECHNICAL  >>  WORKBOOKS  >>  PRE-BUILT  >>  TASK DETAIL



Perform Shutdown, Startup, & Pressure Change Operations
Reviews requirements for maintaining MAOP, reading plat books, operating valves and verifying position, lockout/tagout procedures, measuring and interpreting pipeline operating parameters. Explains the basic process of shutting down, isolating, and restarting the pipeline segment.


Back to Workbook Detail